← Back to Valence People
Valence People prototype
Role
Theme
View
prototype · planned functionality on fictional data
ME

My dashboard

PS
Annual leave remaining
14.5 of 25 days
8.5 taken 2 booked 14.5 left

Leave year ends 31 December. Carry over up to 5 days.

Next time off
Mon 14 to Fri 18 Sep

5 days annual leave, approved by Daniel Okoye on 12 Aug

Approved
Waiting on me
0 actions

Nothing needs you right now.

Also for you
Coming later

Your team this week

PersonStatusAnnual leave leftNext off
AK
Amara Kensington
Senior Engineer
Away today6.0 daysBack Tue 1 Sep
TN
Tomas Nowak
Engineer
In16.5 daysThu 17 Sep
RF
Ruth Fenwick
QA Lead
Sick, day 211.0 daysOpen ended
JB
Joseph Baptiste
Engineer
In2.5 daysTue 22 Dec

Joiner provisioning

Starting in the next 14 days
2
1 task failed
Mailbox creation for Sana Iqbal has failed twice against the mail platform. The rest of her joiner completed. Her manager and the platform owner have been told.

Company days off

Summer bank holiday
Mon 31 Aug
Christmas Day
Fri 25 Dec
Boxing Day, observed
Mon 28 Dec

Calendar shown is Hertford. Offices have their own calendars.

Configuration health

Three things need attention before the leave year rolls over.

Colombo holiday calendar for next year has not been loaded. It expires in 61 days.
Two roles have no provisioning rule, so joiners in them route to a manual task.
Jurisdiction pack UK 2026.1 verified 06 Apr 2026. Next review due 06 Apr 2027.

Book time off

Your balance updates as you choose. Nothing is submitted until you press Request.

If this is approved
9.5 days left
Entitlement this year
25.0
Already taken
8.5
Already booked
2.0
This request
5.0

Who else is off then

Names only. Your team's leave reasons are never shown to peers.

Entitlement
25.0

20 statutory plus 5 contractual

Taken and booked
10.5

8.5 taken, 2.0 booked ahead

Remaining
14.5

5.0 can carry into next year

Every request, and what happened to it

DatesTypeDaysStatusDecision
A cancelled request is never deleted. It stays here with a compensating entry in the ledger, so the balance at any past date can still be reproduced.

Report an absence

This is not leave. It has no balance, it needs no approval, and it stays open until you tell us you are back.

What happens next

1
Your manager is told

Reason included. Peers see only that you are away.

2
Day 8 triggers a fit note

We will ask you for it and remind you once.

3
You mark yourself back

The absence closes and the duration is calculated for you.

4
Return to work conversation

Prompted to your manager, recorded against the absence.

PS
Priya Sharma
Engineering Manager · Hertford · started 4 March 2019
Phase 1Self-service with approval where it matters. Which fields need approval is configuration, not code.EM-07 · EM-12 · AD-11
Known as
Priya
Pronouns
she/her
Personal email
p.sharma@example.com
Mobile
07700 900142
Home address
18 Fore Street, Hertford SG14 HR approves
Bank account
Ending 4417 Finance verifies by phone
National insurance
QQ •• •• •• C read only
Fields marked as needing approval are marked before you edit them, not after you submit. A field you cannot change at all is never shown as an empty box. Bank changes go to Finance, not HR, because HR holds no access to bank fields.
Job title
Engineering Manager
Department
Product Engineering
Reports to
Daniel Okoye
Office
Hertford
Working pattern
Mon to Fri, 37.5 hours
Contract
Permanent, full time
Notice period
3 months
Thinking about leaving? Your notice, what you would be owed and how to resign are on the tab.
First contact
Anil Sharma, partner, 07700 900318
Second contact
Not provided
Your emergency contacts are visible to HR only. Your manager cannot see them.
Phase 2Resigning is a form, not an email. It reaches your manager and HR privately, and nothing happens until HR has talked to you.OB-20 · OB-23
Notice period
3 months
If you resigned today
Earliest last day Fri 27 Nov
Holiday by then
0.0 days left to take or be paid
After you leave
Payslips, P60 and a copy of your data for 12 months, through a sign-in that needs no company account
1
You resign here

It goes to Daniel and HR only. Your team and payroll are not told.

2
HR talks to you

Nothing is scheduled yet, so you can withdraw with nothing to undo.

3
HR confirms your dates

Last working day, and the date pay ends. They can differ.

4
Your last day

Access ends at 17:30. An exit interview is offered, never seen by your manager.

Leaving

If you have decided to leave, you can resign here. It goes privately to Daniel and to HR, and nothing else happens until HR has talked to you.

AskedFieldGoes toStatusWhat happens next
3 Jun 2026MobileApplied straight awayDoneSelf-editable field, no approval needed. The old number is kept in history.
14 Jan 2026Emergency contactApplied straight awayDoneVisible to HR only.
Waiting on you

Each request carries the balance and the cover position with it, so you never have to open another screen to make the decision.

TN
Tomas Nowak
Engineer · asked 3 days ago
Oldest
Dates
Mon 19 to Wed 21 Oct
Days
3.0 annual leave
Balance after
13.5 of 25
Ruth Fenwick is off on the Thursday, so two of four are away that week. Nobody is on the release rota those days.
JB
Joseph Baptiste
Engineer · asked yesterday
Would go negative
Dates
Tue 22 to Thu 31 Dec
Days
6.0 annual leave
Balance after
Minus 3.5
Joseph has 2.5 days left. Approving this takes him 3.5 days over, which policy allows only with HR agreement. Approving here will ask HR, not silently overdraw.
AK
Amara Kensington
Senior Engineer · asked yesterday
Half day
Dates
Fri 4 Sep, afternoon
Days
0.5 annual leave
Balance after
5.5 of 25
RF
Ruth Fenwick
QA Lead · asked this morning
Time off in lieu
Dates
Fri 30 Oct
Hours
7.5 from the June release weekend
TOIL after
4.0 hours, expires 31 Dec
TN
Tomas Nowak
Engineer · overtime · asked 4 days ago
Overtime
When
Sat 22 Aug
Hours
3.0, weekend release
Taken as
Time off in lieu
RF
Ruth Fenwick
QA Lead · timesheet · submitted 21 Aug
Timesheet

Week of 17 Aug: 37.5 hours, no overtime. Matches her working pattern.

MO
Michael Oyelaran
Engineer · flexible working request · received 14 Aug
Decide by 14 Oct

From 3 to 3.5 days a week from 1 Oct, adding Thursday mornings. The law gives two months to decide, including any appeal, so the clock is shown and HR is told if it gets close.

AR
Quarterly access review
Your 6 reports · due Tue 15 Sep
Review

Confirm each person still needs what they have. Anything you remove is taken away by the same connectors that gave it.

Away today
2 of 6
Leave left across the team
61.5 days

Two people are carrying more than 15 days into the last quarter.

Absence, rolling 12 months
2.1% of days

Everyone who reports to you

Click a person to open their detail
PersonStatus todayEntitlementTakenBookedLeftAbsence, 12 months
AK
Amara Kensington
Senior Engineer
Annual leave25.018.50.56.01 spell, 2 days
TN
Tomas Nowak
Engineer
In25.06.52.016.5None
RF
Ruth Fenwick
QA Lead
Sick, day 227.015.01.011.03 spells, 7 days
JB
Joseph Baptiste
Engineer
In25.016.56.02.51 spell, 1 day
SI
Sana Iqbal
Engineer · starts 8 Sep
Joining8.30.00.08.3n/a
MO
Michael Oyelaran
Engineer · 0.6 FTE
Non working day15.04.00.011.0None
Part time entitlement is shown in days at that person's own working pattern, and a joiner's entitlement is pro rated from their start date. Neither is a rounding of the full time figure.
AK
Amara Kensington
Senior Engineer · Hertford · reports to you
Annual leave left
6.0
Time off in lieu
0.0 hours

Nothing accrued this quarter.

Absence, rolling 12 months
2 days

One spell in February. No trigger reached.

Leave this year

DatesTypeDaysStatus
25 to 28 AugAnnual leave4.0Away now
4 Sep, afternoonAnnual leave0.5Waiting on you
13 to 24 JulAnnual leave10.0Taken
3 FebSickness2.0Closed

What you can see, and what you cannot

Row scope and field scope are resolved before the query runs, so this is not a hidden section of a fuller page.

Leave and absence
Visible
Job, pattern, manager
Visible
Reviews and objectives
Visible
Salary and bank details
Not visible to managers
Absence reasons
Visible, not shared onward
Employee relations cases
Participants only
PersonEmployee IDEntityOfficeWorker typeStatus
AK
Amara Kensington
Senior Engineer
EN-00418Northfield UKHertfordEmployeeCurrent
SI
Sana Iqbal
Engineer
EN-00622Northfield UKHertfordEmployeeStarts 8 Sep
DP
Dilhan Perera
Engineer
EN-00517Northfield UKColomboContractorCurrent
MO
Michael Oyelaran
Engineer
EN-00389Northfield UKHertfordEmployee, 0.6 FTECurrent
RF
Ruth Fenwick
QA Lead
EN-00204Northfield UKHertfordEmployeeAbsent
GB
Grace Bello
Support Engineer
EN-00151Northfield UKHertfordEmployeeLeft 30 Jun 2026
A person who has left is still a person. Their record stays, scoped down to what retention requires, and a rehire links to the same person rather than creating a second one.
AK
Amara Kensington
EN-00418 · Northfield UK · Hertford · joined 11 January 2021
Job title
Senior Engineer
Department
Product Engineering
Reports to
Priya Sharma
Office
Hertford
Working pattern
Mon to Fri, 37.5 hours
Contract
Permanent, full time
Salary
£68,500 HR and Finance only
Effective from
1 April 2026
Right to work
Verified passport, 14 Jan 2021
Notice period
3 months
Probation
Passed 11 April 2021
Leave policy
UK standard, 25 days
Changing the job title asks whether this is a change from a date or a correction of a mistake. The first moves the person forward. The second rewrites what we said was true, and both are kept.
Date of birth
2 September 1991
Home address
44 Bengeo Street, Hertford SG14
Personal email
a.kensington@example.com
Emergency contact
Not visible to line managers
Bank account
Ending 2280 HR and Finance only
Health record
Occupational health only
•
Salary changed to £68,500

Effective 1 Apr 2026 · recorded 18 Mar 2026 by Nadia Haq · change, not a correction

•
Promoted to Senior Engineer

Effective 1 Oct 2024 · recorded 26 Sep 2024 by Priya Sharma

•
Start date corrected to 11 Jan 2021

Was 18 Jan 2021 · corrected 3 Feb 2021 · the original value is retained and reportable

•
Joined Northfield UK

Effective 11 Jan 2021 · Engineer, Hertford

This is the difference between a change and a correction, on screen rather than in a design document. A report run as at March 2021 shows the corrected date, because that is what was true.

Who can see a document and how long it is kept come from its category, not from the person uploading it.

DocumentCategoryAddedRetention
Contract of employmentContractual11 Jan 20216 years after leaving
Promotion letterContractual26 Sep 20246 years after leaving
Passport scanRight to work14 Jan 20212 years after leaving
Salary review letterPay18 Mar 20266 years after leaving
Three ways a joiner starts. HR adds them here at go-live. From Phase 2, an accepted offer in Hiring creates them automatically. A rehire links to the person's existing record. All three run the same joiner process.
Starting in 14 days
2
Tasks complete
11 of 14
Needing a person
3

1 failed, 2 are manual by design.

Sana Iqbal, starts Tuesday 8 September

1 task failed
✓
Right to work verified

Gate passed 14 Aug. Nothing downstream could start before this.

✓
Identity account created

Identity provider · s.iqbal · created 21 Aug, read back and confirmed

!
Mailbox

Failed twice. The licence has not been assigned, so the mailbox cannot exist yet. Owner and HR were told at the first failure.

3
Groups and licences

Waiting on the mailbox. Will run automatically once it succeeds.

●
Building access card

Manual by design. Facilities, due Friday 4 Sep. Evidence required before the joiner closes.

●
Laptop and phone

Manual by design. IT, due Thursday 3 Sep.

Nothing here is hard coded. The task list came from the rules for her role, department, office and worker type, and it will look different for a Colombo contractor.
Where this joiner is wired
Identity
Identity provider, direct
Mail
Mail platform, failing
Finance system
Via the service desk
Building access
Manual, named owner
Partial failure does not stop the rest. The joiner is reported as partly provisioned rather than as done, which is the difference between a system you can trust on a Monday morning and one you cannot.

Nadeesha Silva, starts Monday 14 September

On track
Right to workIdentityMailboxGroupsLaptop, due 11 Sep

Colombo, contractor. Different rules, different platforms, same task graph and same screen.

Phase 1Everything a customer would want different is a row here, not a release. Every change is versioned, attributed and in the audit log. AD-01 to AD-11 · CFG · PRV-01 to PRV-10

How ready the configuration is

Leads with what is not ready. Each line opens the tab that fixes it.

Colombo holiday calendar for 2027 has not been loaded. It expires in 61 days.
Two platforms have no deputy owner, so a manual task could reach nobody.
Jurisdiction pack UK 2026.1 verified 06 Apr 2026. Next review due 06 Apr 2027.

Preview a joiner

Choose who, and see exactly what the rules would create. Writes nothing.

Offices

OfficeLegal entityCountryTime zoneHoliday calendar
HertfordNorthfield UKUnited KingdomEurope/London2026 and 2027 loaded
ColomboNorthfield LankaSri LankaAsia/Colombo2027 missing
GalleNorthfield LankaSri LankaAsia/Colombo2026 and 2027 loaded
KandyNorthfield LankaSri LankaAsia/Colombo2026 and 2027 loaded

Sri Lankan Poya days are lunar and gazetted each year, which is why loading next year's calendar is a recurring task with an owner, not a one-off.

Access matrix

Click a cell to change the grant. New joiners get it at once; movers are reconciled on their effective date.

none · readonly · standard · admin
PlatformCategoryAutomationOwnerDeputyRemoved on leaving
PolicyApplies toDaysCarry overCarry expiresAccrual
UK standardNorthfield UK, all offices31 MarFixed hours, days
Colombo localColombo office30 JunSri Lanka statutory schedule
Entitlement cannot be set below the statutory floor in the jurisdiction pack. Try entering 18 for UK standard.

Why does this person have 23 days

The most common support question a product like this generates. Answering it by reading code is what turns an implementation into a support contract, so the answer is a screen.

RequestGoes toThenIf nobody acts
Annual leaveLine managerHR, if it goes past the balanceReminder at 2 days, manager's manager at 4
Overtime and timesheetsLine managerPayroll extract, if paidReminder at 3 days
Flexible workingLine managerHR told at 6 weeks of the 2 month limitHR takes it over at 7 weeks
Move, promotion, pay changeManager's managerHR, then Finance for payReminder at 2 days
Home addressHRPayroll extractReminder at 2 days
Bank accountFinance, with a verification callPayroll extractNever applied without the call
Job requestFinance for budgetFinance Director, if not in budgetReminder at 3 days

When an approver is away, off sick or has left, the request moves on automatically. Nobody has to remember to set up a delegate before they go on holiday.

FieldEmployee, ownManager, reportsHRFinanceSystem Admin
Job, manager, working patternViewViewEditViewNone
Home address, personal contactEdit, HR approvesNoneEditViewNone
SalaryViewNoneEditEditNone
Bank accountEdit, Finance verifiesNoneNoneEditNone
Absence reasonViewView, not shared onwardViewNoneNone
Health record, fit notesViewDates onlyNamed HR onlyNoneNone
Reviews and objectivesViewEditViewNoneNone
Employee relations casesOwn papersIf namedIf namedNoneNone

System Admin configures the product and cannot read people's records. A field a role cannot see is never fetched, so it cannot leak through a report or an export either.

Where hours worked come from

One choice per tenant. Overtime, time off in lieu and the payroll extract work the same either way.

Time-tracking connection

Connected
Endpoint
the tool’s published API
Credential
secret://northfield/time-tracking never stored here
Reads
Worklogs and timesheet approval status, per person and period
Writes
Submit and approve timesheets, when someone does it in Valence People
People matched
62 of 64
Sync
Every 6 hours, and on demand. Last run 06:00, 0 errors.

Other connections

SystemDirectionWhat movesStatus
Identity providerTo the identity providerAccounts, groups, licences for joiners, movers and leaversConnected
PayrollBothMonthly change extract out, tax and pension fields backFile, monthly
A time-tracking tool you already useBothHours in, timesheet approvals both waysConnected
Service deskTo the service deskFinance system access, through its own approvalConnected
CalendarTo the calendarApproved leave as out-of-officeNot set up

Words

Override any term for this tenant. It changes everywhere it appears, including messages and exports.

Leave
Absence
Line manager
Time off in lieu

Branding is configuration, not a build

The colours, the wordmark and the words on screen are tenant configuration rows. Change them here and every screen follows, with no release and no restart.

Brand colour
#DE6778 used for actions and emphasis
Navigation style
Dark rail
Product name shown
Northfield People
Week starts
Monday
Use the theme and brand controls in the black bar above. That bar is the demo's console, not part of the product; in the product these are settings on this screen.
Phase 2Team calendar alongside the team leave overview. Built on the working-pattern calendar, so non-working days and half days are drawn, not guessed.LV-05 · LV-10 · LV-13 · LV-06
Away today
2 of 7

Amara on annual leave, Ruth off sick.

Thin days this month
0

Days when fewer than 4 of 7 are in.

Waiting on you
0

Pending requests are drawn hatched, so you approve with the overlap in view.

September 2026

Annual leave Waiting for approval Absence Time off in lieu Not a working day for them Office holiday Day in red: fewer than 4 in
You see the type of leave because these people report to you. A colleague looking at the same week sees names only, never a reason. The threshold for a thin day is set per team in configuration.
Phase 2Org chart drawn from the line-manager field, with dotted lines and open vacancies. The directory behind it is Phase 1.EM-09 · EM-13 · EM-26 · RPT-02
  • DO
    Daniel Okoye
    Head of Engineering
    3 direct, 16 total
    • PS
      Priya Sharma
      Engineering Manager, Hertford
      6 direct, 1 open
      • AK
        Amara Kensington
        Senior Engineer
      • TN
        Tomas Nowak
        Engineer
      • dotted to KS
        RF
        Ruth Fenwick
        QA Lead
      • JB
        Joseph Baptiste
        Engineer
      • SI
        Sana Iqbal
        Engineer, starts 8 Sep
      • MO
        Michael Oyelaran
        Engineer, 0.6 FTE
      • +
        Engineer
        Vacancy, REQ-0142
    • NP
      Nimal Perera
      Engineering Manager, Colombo
      5 direct
    • KS
      Kamal Silva
      QA Practice Lead, Colombo
      2 direct, 1 dotted
PS
Priya Sharma
she/her
Every field on the card is one the tenant has marked directory-public. Salary, personal contact details and absence never appear here, whoever is looking.
A reporting line that would loop back on itself is rejected when it is saved, not discovered when the chart is drawn.
PersonDepartmentOfficeWork emailManager

Preferred names throughout. Legal name appears only where the law needs it: contract, right to work, payroll handover.

Phase 1Leaver paths, four separate dates and deprovisioning are go-live. The exit interview, reason codes and rehire flag are Phase 2.OB-09 · OB-10 · OB-11 · OB-12 · OB-20 · LG-07
Resignations waiting to be confirmed are in your inbox. Dismissal, redundancy and end of contract start here.
Leaving in the next 60 days
2
Access removal scheduled
9 systems

Identity always last, so nothing is orphaned.

Equipment to come back
3

The leaver cannot close until each one is confirmed.

LC
Liam Carter
Support Engineer · Hertford · resigned · standard path
In notice
Notice start
31 Jul 2026
Resignation received the same day
Last working day
Fri 25 Sep
Access ends at 17:30
Garden leave
None
Would end access, not employment
Termination date
Wed 30 Sep
Pay and service end. 3 days holiday in notice.
The leaver process
✓
Resignation confirmed by HR

Reached his manager privately first. Nothing downstream ran until HR confirmed.

✓
Holiday owed shown to Liam

3.0 days left. He chose to take them 28 to 30 Sep rather than be paid for them.

●
Knowledge handover

Two tasks with Priya Sharma. Due 23 Sep.

●
Exit interview offered

HR only. Never visible to his line manager.

5
Final pay to payroll

On the September extract. Cut-off is 18 Sep, so a later change is flagged as retrospective.

6
Access removed, then checked

Scheduled for 25 Sep 17:30. Closes only when no active sessions remain.

Access removal, in this order
1
Ticketing
Direct
2
Finance system
Via the service desk
3
VPN and network groups
Direct
4
Mailbox to shared, 30 days
Direct
5
Identity account disabled
Always last
Equipment and manual systems
Laptop

Courier booked for 25 Sep. IT confirms on receipt.

Phone

Returned to IT desk.

Building access card

Facilities, named owner.

Leaving reason
Resignation, career move
Rehire eligible
Yes checked if he applies again
After he leaves
Payslips, P60 and a data export for 12 months
Waiting on 3 confirmations.
KF
Kasun Fernando
Contractor · Colombo · emergency path
Access removed in 22 minutes
Identity disabled 14:05Sessions revokedVPNRepositoryLaptop, due Mon

Emergency path: same-day target, everything revoked at once and identity first, because the risk is the open session, not the orphaned account. The reason is visible to HR only.

Phase 2Payslips come from the payroll system, not from here. Letters, policies and training sit with them so there is one place to look.DOC-04 · DOC-06 · DOC-07 · LG-07
PeriodPaid onNet paySource
August 2026 New28 Aug 2026••••Payroll, received 26 Aug
July 202631 Jul 2026••••Payroll, received 29 Jul
June 202630 Jun 2026••••Payroll, received 26 Jun
P60, tax year 2025 to 202622 May 2026n/aPayroll, year end
After you leave you keep access to payslips, P60s and a copy of your data for a fixed window, through a separate sign-in that needs no company account.
DocumentIssuedSignature
Employment and salary confirmation letters are generated straight away.
Information security policy, version 4.2

Assigned to everyone on 20 Aug. What changed: rules on personal devices and AI tools. Due 10 Sep.

✓
Hybrid working policy, version 2.0

Acknowledged 4 Mar 2026. You signed version 2.0 and that is the current one.

✓
Code of conduct, version 3.1

Acknowledged 11 Jan 2026.

CourseWhy you have itStatusRenews
Security awarenessEveryone, yearlyDue 30 SepEvery 12 months
Data protection for managersPeople managersCompleted 12 Feb 2026Feb 2028
Fire safety, HertfordHertford officeCompleted 9 Jan 2026Jan 2027
Phase 2Objectives are visible all year, not only during the review window, and they move with you if your manager changes.PR-02 · PR-04 · PR-06 · PR-07
2026 annual review
Opens 1 Nov, closes 12 Dec

Self-review first, then Daniel's draft.

Objectives on track
3 of 4
Last update
14 Aug

Check-in with Daniel, outcome recorded.

My objectives for 2026

How a review is signed off

In this order, so you never acknowledge something that is not final.

Self-reviewManager draftCalibrationDiscussion heldReleasedYou acknowledge

If you disagree you can acknowledge and disagree. That routes to HR rather than leaving the disagreement in an email.

Past reviews

2025 annual reviewAcknowledged 19 Dec 2025
2024 annual reviewAcknowledged 16 Dec 2024
Phase 2Review cycle and probation tracking for your team. A review belongs to the period it covers, not to whoever manages the person today.PR-01 · PR-03 · PR-06 · PR-09 · PR-10 · EM-11
Mid-year check-ins
4 of 5 held
Probation
1

Sana Iqbal from 8 Sep. Objectives due by 22 Sep.

Contribution received
1

From Kamal Silva, for Ruth's months before she joined you.

2026 annual review, your team

Cycle opens 1 Nov
PersonObjectivesCheck-inNote
AK
Amara Kensington
Senior Engineer
4 set, 3 on trackHeld 12 Jul 
TN
Tomas Nowak
Engineer
3 set, 3 on trackHeld 2 JulDevelopment plan towards senior agreed.
RF
Ruth Fenwick
QA Lead
3 set, carried overHeld 30 JulJoined you 1 Jun. Kamal's written contribution covers Jan to May and is part of the review.
JB
Joseph Baptiste
Engineer
2 set, 1 at riskNot heldReminder sent 20 Aug. Escalates to Daniel on 3 Sep.
MO
Michael Oyelaran
Engineer, 0.6 FTE
3 set, 3 on trackHeld 9 Jul 
SI
Sana Iqbal, probation
Starts 8 Sep · 6 month probation · 1 month notice during probation
Objectives agreed by
Tue 22 Sep first two weeks
Mid-point review
Mon 7 Dec
Decision needed by
Mon 8 Feb 2027 one month before the end, so notice can still be given
Probation ends
Mon 8 Mar 2027
You see reviews for your direct reports only. HR sees every review. Peers see nothing. The rule is in the permissions matrix, so it is the same in every screen, report and export.
Phase 2Hours are recorded against your working pattern, so you only enter what differs. Overtime counts once your manager approves it, and time off in lieu is held in the same ledger as leave.TIM-01 to TIM-04 · TIM-07 to TIM-09
Your hours come from your time-tracking tool
Keep logging work in your time-tracking tool as you do now. You do not enter hours twice.

Last synced today 06:00 · next sync 12:00 · matched to you by your account in the time-tracking tool

Logged this week
29.5 hours

Pattern is 37.5, Mon to Fri. Thursday is still in progress.

Over your pattern
2.0 hours

Wednesday, release REL-412. Claim it below.

Time off in lieu
0.0 hours

3.0 waiting on your manager from 22 Aug.

Week of Monday 24 August, from your time-tracking tool

Open in your time-tracking tool
Mon 24Tue 25Wed 26Thu 27Fri 28Total
Working pattern7.57.57.57.57.537.5
Logged in your time-tracking tool7.57.59.55.0–29.5
Biggest itemPAY-311PAY-318REL-412PAY-318
Over pattern+2.02.0
Hours are read from your time-tracking tool and cannot be edited here. If a day is wrong, fix the worklog in your time-tracking tool and it comes across on the next sync.
Submitting here submits your the time-tracking tool timesheet too, so it is never done twice.

Claim the 2.0 hours from Wednesday

Your time-tracking tool records the time. Valence People decides what it becomes: time off, pay, or just a record.

This week
0.0 hours

Pattern is 37.5 hours, Mon to Fri.

Overtime this week
0.0 hours

Counts after your manager approves.

Time off in lieu
6.0 hours

4.0 hours lapse on 31 Dec. You will be warned 30 days before.

Week of Monday 24 August

Open
Mon 24Tue 25Wed 26Thu 27Fri 28Sat 29Sun 30Total
Working pattern7.57.57.57.57.5offoff37.5
Hours worked 0.0
On callStandby, Sat to Sun1 claim
Over pattern0.0
Overtime as time off in lieu goes into the leave ledger once Daniel approves. The rate comes from configuration for your contract and jurisdiction.
Your team's timesheets and overtime are in Approvals, with their leave, so there is one place to look.
Phase 2Job requests, a candidate pipeline and offers. When an offer is accepted, an external hire becomes a joiner with nothing typed twice, and an internal hire becomes a mover on their existing record.HP-01 · HP-02 · HP-04 · HP-05 · HP-08 · HP-09 · HP-10

Job requests

RequestRoleOfficeHiring managerWhyStatus
REQ-0142EngineerHertfordPriya SharmaGrowth, budgetedOpen, 9 candidates
REQ-0139Support EngineerHertfordMarta KowalskiReplaces Liam CarterWith Finance for approval
REQ-0145QA EngineerColomboKamal SilvaGrowthDraft

REQ-0142 Engineer, Hertford

Also shown as a vacancy on the org chart
Applied 3
Ben Marsh
Referral from Tomas Nowak
Aisha Rahman
Careers page
Owen Price
Agency
Screening 1
Lucia Gómez
Phone screen booked 1 Sep
Interview 2
Marcus Bell
Technical interview 2 Sep
Feedback: 1 of 2 in
Hiroshi Tanaka
Internal, Support Engineer
His manager is not told

He decides when his manager hears. If he is offered the job, it becomes a change to his current record. No new person is created.

Offer 1
Elena Rossi
Offer sent 24 Aug · pay band approved
HR records the acceptance
Accepted 0
Nobody yet
Waiting for HR
0

Everything that needs an HR decision, in one place.

Oldest
3 days

Tomas Nowak's promotion. Target is 2 working days.

Due this week
2

A right-to-work follow-up and an absence review.

Resignations waiting for you

1
CM
Chloe Martin
Support Engineer · resigned through the form 26 Aug · asks for Fri 20 Nov as her last day · Marta Kowalski told privately
A resignation stays on hold until HR confirms it. Until then no access is scheduled for removal, payroll is not told, and the person can withdraw it with nothing to undo. Dismissal, redundancy and end of contract start with HR, using Start a leaver.

Change requests

1Changes people asked for, oldest first
TN
Tomas Nowak, promotion to Senior Engineer
Raised by Priya Sharma 24 Aug · approved by Daniel Okoye 25 Aug · effective Thu 1 Oct · salary to £61,000

Leave needing HR

0Beyond what a manager can approve alone
Nothing waiting. A manager approving leave beyond the balance sends it here.

Documents to check

1
MO
Michael Oyelaran, first aid certificate
Uploaded 25 Aug from My documents · qualification · expires Aug 2029

Due soon

HT
Hiroshi Tanaka, right to work follow-up
Visa expires Mon 30 Nov 2026 · a follow-up check is needed before then or he cannot keep working
RF
Ruth Fenwick, absence review
3 spells in 12 months. One more reaches the review trigger, so a supportive conversation is suggested now
Phase 1Absence is its own model: no balance, no approval, open until the person is back. Triggers are applied by rule, not by whichever manager notices.AB-01 to AB-08
Open now
1

Across all offices.

Absence rate, 12 months
2.6% of days

Support is highest at 3.4%.

Return-to-work talks due
0

Within 3 working days of coming back.

Open and recent

PersonReasonFromDaysFit noteReturn to work

Near or at a trigger

3 spells or 8 days in 12 months
Ruth Fenwick

3 spells, 7 days. One more spell starts a supportive review.

Leah Brooks, Colombo

4 spells, 9 days. Review held 2 Jul. Next check 2 Oct.

Review held

Long-term absence

Over 4 weeks moves to long-term casework, with an occupational health referral and keeping-in-touch dates.

Nobody is on long-term absence.
Phase 1Year end closes balances, carries over up to the cap and sets an expiry. HR sees exactly who would lose days months before it happens.LV-14 · LV-18
Northfield UK leave year
1 Jan to 31 Dec 2026

Carry over up to 5 days, used by 31 Mar.

Days at risk
28.5

Across 5 people if nothing more is booked.

Rollover
Not scheduled

Northfield Lanka runs April to March, separately.

Preview as at 31 Dec 2026

Hertford, Product Engineering and Quality
PersonLeft todayBookedWould carryWould lose
Tomas Nowak16.53.0 pending5.08.5Nudge
Priya Sharma11.50.05.06.5Nudge
Ruth Fenwick11.01.05.05.0Nudge
Michael Oyelaran11.00.03.0 pro-rated cap8.0Nudge
Amara Kensington6.00.55.00.5Fine
Joseph Baptiste2.57.00.00.0Minus 3.5, HR to agree
Nothing changes until the rollover runs. Each person's carried days appear as one ledger entry with an expiry date.
Phase 2Employee relations as cases, not folders. Access is per case, to named people, so HR can be kept out of a case that concerns an HR colleague.ER-01 to ER-08 · EM-05 · EM-25
You see the cases you are named on. Two cases exist that you cannot open, and you can see that they exist only because you are HR.
CaseTypeAboutStageNext dateAccess
ER-0014GrievanceJoseph Baptiste, about workload allocationInvestigationThu 3 Sep, meeting3 named people. Priya Sharma excluded, the grievance concerns her team
ER-0011CapabilityLeah Brooks, ColomboImprovement plan, week 4 of 8Mon 14 Sep, reviewNimal Perera, Nadia Haq
ER-0006DisciplinaryOwen Hart, SupportClosed, first written warningWarning expires 14 Jan 2027Closed, HR only
ER-0016GrievanceRestrictedYou are excluded Concerns an HR colleague. Held by Helen Ward.
Phase 2A standard report set, run as at any date. Field security applies to reports and exports exactly as it does to screens.RPT-01 to RPT-08
Today's structure and values.

Headcount by office

64

Turnover, last 12 months

9.4%

6 leavers. Reasons come from the leaving-reason codes.

Absence rate by department

2.6%

Holiday liability

£71,400

412 days outstanding, valued at each person's day rate. HR and Finance only.

Groups smaller than 5 people are shown as "fewer than 5" in exports, so a report cannot be used to work out one person's absence or pay.
Phase 2Each month the HR record and the payroll system are compared field by field. Each field has one system that is the master, so a difference always has an owner.PAY-04 · PAY-05 · PAY-06
Compared, August
64 people
Match
61
Differences
3

Differences to resolve

Run 1 Sep 06:00
PersonFieldHR recordPayrollMaster
Amara KensingtonSalary£68,500 from 1 Apr£66,000HR
Michael OyelaranWorking pattern3.5 days from 1 Aug3 daysHR
Grace BelloStatusLeft 30 JunActive, paid JulyHR
Who is master: HR for job, pattern, status and salary; payroll for tax code, pension contributions and net pay. A difference in a payroll-mastered field updates the HR mirror instead.
Phase 2Every quarter each manager confirms their people still need what they have. Removals go through the same connectors that granted the access.AD-11 · PRV-18 · OB-22

Q3 2026 campaign

Closes Tue 15 Sep6 of 9 managers done
ManagerPeopleStatus
Priya Sharma6Not started
Nimal Perera5Not started
Marta Kowalski7Not started
Kamal Silva2Done 24 Aug, 1 removal

Your people

Flagged lines are unusual for the role
PersonAccessSinceKeep
Amara KensingtonProduction, adminOct 2024
Tomas NowakRepository, standardMay 2022
Ruth Fenwick UnusualFinance system, readonlyMar 2025, a one-off project
Joseph BaptisteProduction, standardJan 2025
Michael Oyelaran UnusualCustomer portal, adminFeb 2023, from his time in Support
2 removals will be sent to the connectors.
Phase 1Bank changes come to Finance, never to HR, and are only applied after a call to a number already on file. Job requests need budget approval here before hiring starts.EM-07 · EM-12 · HP-01

Job requests for budget approval

Phase 2, with Hiring
RQ
REQ-0139 Support Engineer, Hertford
Raised by Marta Kowalski 21 Aug · replaces Liam Carter · band S2, £42,000 to £48,000 · within the Support budget

Bank detail changes

Never applied straight from a form
RF
Ruth Fenwick
Asked 25 Aug, from her own login · new account ending 0912 · old account ending 6634
Call needed
Number on file
07700 900477 held since 2019
Email at both addresses
Sent 25 Aug
Payroll effect
September run, if applied before 18 Sep

Rejecting locks bank changes for this person and tells the security team, because an unconfirmed change is the usual sign of payroll fraud.

Phase 2The system does not run payroll. It sends payroll every change since the last run, with a cut-off, and flags anything that reaches back into a closed month.PAY-01 · PAY-02 · PAY-03 · TIM-06
Period
September 2026

Cut-off Fri 18 Sep, 17:00

Changes so far
6
Needs attention
2

One retrospective, one missing detail.

What goes to payroll this month

Draft
PersonChangeEffectiveDetailFlag
Sana IqbalStarter8 Sep£52,000, pro-rated from her start dateBank details missing
Liam CarterLeaver30 SepFinal pay. Holiday owed 0.0 days, all taken in notice.None
Ruth FenwickAbsence26 AugSickness, open. Sick pay rules apply from day 4.None
Michael OyelaranWorking pattern1 Aug3 days to 3.5 days a week, recorded 20 AugRetrospective, August is closed
Tomas NowakPromotion1 Oct£61,000. Future-dated, goes on October’s extract.Next month
Priya SharmaOvertime26 Aug2.0 hours, only if taken as pay rather than time offWaiting on approval
Sending locks the period. Anything after it is flagged as retrospective next month.
Phase 1Every change, who made it, when, and the value before and after. Append-only: nobody can edit or delete a line, including System Admin.AD-08 · LG-09

Audit log

WhenWhoActionRecordDetail
27 Aug 09:12Nadia HaqViewed salaryAmara KensingtonReads of restricted fields are logged too
27 Aug 08:40SystemProvisioning retry failedSana IqbalMailbox, licence not assigned, attempt 2
26 Aug 16:05Ruth FenwickAsked for bank changeRuth FenwickRouted to Finance, emails sent to both addresses
26 Aug 09:31Priya SharmaRecorded absence on behalfRuth FenwickSickness from 26 Aug, told by phone
25 Aug 11:20Daniel OkoyeApproved mover requestTomas NowakEngineer to Senior Engineer, effective 1 Oct
20 Aug 14:02Sam AdeyemiChanged configurationLeave policy, Colombo21.0 to 21.0 days, carry-over cap 5 to 7. Reason: board decision 14 Aug

Lines in this session appear at the top as you use the demo.

Phase 1A new joiner has no company account yet. They get a link to their personal email that only reaches this page, and it stops working on their first day.LG-07 · EM-04 · OB-17
Welcome to Northfield
Kavya, you start on Mon 5 Oct in Hertford

Engineer, reporting to Priya Sharma. Your buddy is Tomas Nowak.

Done
0 of 4

Before your first day

Link valid until Sat 3 Oct
Upload your right to work document

Passport or share code. HR still checks the original with you on day one, because the law needs that.

Add your bank details

So you are paid on time in October. Only Finance can see them.

Add an emergency contact

Seen by HR only.

Read two policies

Code of conduct and information security, about 15 minutes.

Your first day

1
09:30 at reception, Hertford

Ask for Nadia Haq. Bring your passport.

2
10:00 laptop and accounts

Delivered to the office, set up with IT.

3
12:00 lunch with Tomas

Your buddy for the first month.

4
14:00 with Priya

Your first fortnight and probation objectives.

If something here is wrong, for example your start date, reply to the email we sent. HR updates it and every task follows.
Phase 1

Screen name

This screen is in the design and in the release plan, and it is not drawn in this demo. The demo covers the navigation, the palette and the twenty screens that carry the argument. Everything else is placed rather than drawn, so the shape of the product is honest about what has been decided and what has not.

Requirements
,
Release phase
1
Specified in
UX Design, screen inventory
PrototypeFictional data· planned functionality, in development · for timelines contact info@valencedynamics.co.uk